Sunday, 15 March 2015

Galley Makeover - Half Way

Hi everyone,
I thought of entitling this "point of no return", but of course we're well past that point in the galley project.  We are probably past half way but to call this point "the beginning of the end" would be tempting fate!

The sink side of the galley is now complete apart from building the locker lid and painting the locker interior.  We've been using the sink for a week now and it is brilliant.

Sink and adjacent worktop with lid-less locker outboard
The fridge cool box is coming along well.  The interior floor and walls are now installed and the top cover is being constructed.

4mm ply interior walls and top cover installed
Middle and upper 9mm ply top covers

Three layers of ply will form the top surface
We're getting close to calling the fridge mechanic to schedule installation of the evaporator plate and connection to the condenser unit.

Separately from the galley makeover we now have a new s/s tiller.  It replaces the wooden tiller which will be retained as a spare.  The new tiller will make hand steering much easier due to the width of the loop.  Of course it has a pin for the autopilot ram and a chain hook for the vane gear.

New tiller
Note the liferaft which was recently serviced by Great Circle in Queensland.

Thursday, 5 March 2015

Galley Makeover - The End of the Beginning

Hi everyone,
It's been a while since our last blog and the galley makeover is moving ahead steadily.  The fridge cool box now has its insulation fitted and the new sink and adjacent locker are fitted.  Here's how it all happened.

First the outer box was lined with sticky-back aluminium tape.  This should reflect any radiant heat.

Fridge cool box lined with aluminium
Next we added 75mm extruded polystyrene (XPS) insulation panels.  Some of the panels needed to be carefully shaped to fit.  XPS proved very easy to work with.  The panels were glued in place using Liquid Nails.  Amazing how many tubes were consumed.  We've painted on a couple of coats of epoxy over the panels to prepare them for the 4mm plywood which will form the inner floor and walls.

75mm XPS insulation panel shaped to fit
Insulation panels glued in place
We purchased the condenser unit and evaporator plate from Outback Marine in Queensland.  It arrived about a week after ordering.

Veco Frigoboat Capri CF50
With the fridge cool box insulation done we turned our attention to the forward part of the galley.  This will house the new sink and an insulated (but not refrigerated) locker.  The new sink will be supported by a plywood board which sits on the "sill" made for the old double sink.  We are epoxying all plywood panels to seal them.

New sink and epoxied support board
With the old sinks and locker removed we took the opportunity to clean and paint the volume under them.  We also replaced the nearly 30 year old water filler hose which turned out to be extremely brittle.  It cracked apart during removal.

Repainted compartment
The new locker which lives outboard of the sink will have a flush lid.  This required a "stepped" top cover which was interesting to construct.

Locker top
Locker box and top
The locker only just fitted through the sink cutout so its XPS insulation panels were glued on after it entered the compartment.  It has 75mm insulation on the bottom, 50mm outboard and 25mm elsewhere (no room for more).  The blue panel can be seen in the photo below.
Insulated locker mounted
We decided to fit a shelf under the new sink to make use of some of the spare volume in the compartment.  We are also replacing and rearranging the plumbing under the sink.
Shelf under sink with holes for sink drain and bilge pump outlet's vented loop line 
Starting to fit new plumbing
Today the Laminex Aquapanel work top and sink were fitted.  Looking good so far!  The lid for the locker is still to be built.

Aquapanel and sink installed!
Tomorrow we should have the water faucets fitted and plumbing reconnected.  Twill be nice to no longer be getting water from a jerry can for a cuppa or to do the washing up!

Next week we will resume construction of the fridge.

Saturday, 21 February 2015

Galley Makeover - The Beginning

Hi everyone,
It's been a while since our last blog.  We've been busy on various small projects and have started a big one - a galley makeover!  This started with a decision to replace our portable Waeco fridge with a better insulated built-in unit.  Then our sinks started leaking and we realised they needed replacing.  Before we knew it we had a major galley makeover happening.

Existing Galley
The galley had a locker where the Waeco fridge lived.  The top of the unit is visible in the photo above - on the left in its dark grey cover.  There was next to no work surface there.  The second work area was taken up with the dual sinks and a wooden locker outboard.  Next to no work surface there either.

Galley with new work surfaces temporarily in place
The amount of new work surface available will be huge without the portable fridge or the sinks!  On the left (aft) there will be the new fridge lid but it will be flush so not rob work space.  On the right (forward) there will be a single sink plus a flush-fitting locker lid.

Prior to commencing work on the new fridge there was a substantial period of research.  The portable unit gave us about 30 litres of refrigerated volume.  The volume in which the unit sat will give us a 50 litre fridge with 75mm insulation all round.  Due to the woodwork over the area the fridge box will have to be assembled in place and from the outside in.

Key design decisions were the types of condenser unit, evaporation plate and insulation foam.  We decided on a Frigoboat Capri 50F condenser unit with a Inox 180F evaporator plate.  The 50F is "overkill" for a 50 litre fridge but has compressor RPM control which seems like a good idea.  For insulation we chose extruded polystyrene (XPS).  XPS has a slightly lower R rating than polyurethane but is reputed to hold its rating better over time.  XPS is considerably cheaper too and appears easier to work with.

Frigoboat Capri 50F Condenser Unut
Frigoboat Inox 180F Evaporator Plate
XPS Foam Panel
Initial work involved lowering the floor of the compartment in which the fridge box will live.  Since the box will be permanent we needed to ensure future access to the volume below the floor.  That's because a bilge pump hose, gas line and a bunch of electrical cables cross the space.  Happily there was already an inspection hatch providing access to the volume.  All we had to do was fit a conduit around the cables and fit a mouse line to pull any new cables through.  The cables emerge beyond a new wall forming the outboard side of the fridge box.

Floor supports lowered and conduit fitted
 The floor and wall were epoxied individually before being screwed and epoxied into place.

Epoxied floor and wall in place
We decided to avoid an irregularly shaped fridge box, preferring to have a simple cube shape.  That left us with a narrow volume outboard of the fridge box which will be a useful storage locker.  It may become the pots and pans locker, or perhaps a wine store!

Outboard locker
 To be continued!